> *"Without data, you’re just another person with an opinion." - W. Edwards Deming*


![image-20260518-130940.png](media://b2a557c5-0689-4807-8510-07f19f8023db)

*ActionableAgile® Analytics* is a tool built upon the four key flow metrics - **Cycle Time**, **Throughput**, **Age** and **WIP**. It’s tailored to provide users with the knowledge of their *past* work, *present* standing and *future* prospects to aid them in making the most informed, impactful decisions. 

### The Dashboard Chart

The **Dashboard Chart** is our default chart by design. When you're aiming for a smooth delivery, the key to success is making smart decisions at the top - which is why we’ve designed this chart to bring together the four pillars of [flow metrics](https://www.55degrees.se/blog/post/what-are-flow-metrics) in the form of **Flow Insights**. This will provide you with an instant snapshot of whether your process is on track or going off the rails.

> ℹ️ ***Read all about it!*** By focusing on the *movement* of potential value, organisations like **Sanofi** cut production time [from ](https://www.55degrees.se/blog/post/accelerating-flow-in-pharma-how-sanofi-cut-time-to-production-by-80)*[90 days](https://www.55degrees.se/blog/post/accelerating-flow-in-pharma-how-sanofi-cut-time-to-production-by-80)*[ to just ](https://www.55degrees.se/blog/post/accelerating-flow-in-pharma-how-sanofi-cut-time-to-production-by-80)**[12](https://www.55degrees.se/blog/post/accelerating-flow-in-pharma-how-sanofi-cut-time-to-production-by-80)**.

### Flow Insights

The **Flow Insights** provide you with a high-level overview of your loaded data-set. They do this by distilling information from our pre-built charts and highlighting the most important metrics for users to digest. 

> ℹ️ As with all our charts, the data that you see depends on the options you chose in the initial data set creation, as well as the current filters you have active.

#### Cycle Time

This Flow Insight answers the question “**how long** did it take to complete **past work** items?” using the Done Percentiles from the Cycle Time Scatterplot. This information is key to managing stakeholder expectations with data.

Cycle Time is calculated in the app as `(finish date - start date) + 1` - the start and finish are designated by how you’ve configured your Workflow Stage Control. 

---

#### Monte Carlo: How Many

This Flow Insight shows you **how many** work items can be **finished** in the **next 30 days** using four different certainties. 

If you were to forecast for the next 30 days using the Monte Carlo: How Many, you will get a similar forecast - not exactly the same, as the simulations have native randomness 🎲.  

---

#### Work in Progress (WIP)

This Flow Insight lets you know **how many items** in your workflow are** active today**. This metric is taken directly from the current day on the WIP Run Chart. 

> ℹ️ High WIP is the nemesis of predictability; it inflates cycle times and conceals inefficiencies.

To help users monitor WIP, we created the Ideal WIP control under All Charts to show whether your WIP stays within your custom limits.

Work items are considered active when they are in any Workflow Stage designated as [in progress] in the Workflow Stage control.

---

#### Pace: Start vs Finish

This Flow Insight tells you the **monthly rate** at which your work is **arriving** 🛬  and **departing **🛫 in your workflow. So - just like Cycle Time - the **start** is the first [in progress] Workflow Stage and the **finish** is the first [Finished] Workflow Stage. 

Ideally, your arrival and departure rates are similar. If the arrival rate is higher, you end up starting more tasks than you finish, which makes the WIP age and stale - this widget gives you a quick way to check how healthy your process is.

![Screenshot 2026-05-20 at 14.03.21.png](media://844fb5eb-629e-4de5-9a70-12ed94af6734)

- **Start** is the *cumulative* amount of work items that have passed into your first checked Workflow Stage in a specific month.
- **Completed** is the *cumulative* amount of work items that have passed into your last checked Workflow sStage in a specific month.

> ℹ️ Seeing double? If you want to see your Started or Completed work pace more clearly, you can toggle either off at the top of the chart. This is also possible with the WIP Age Insight.

> ℹ️ To get the **average arrival rate and average throughput of the data through to today**, you can go to Summary Statistics on the CFD and grab the information from the system line there.

---

#### Work in Progress (WIP) Age

This Flow Insight gives you the **daily** **Total Age**, **Average Age** and **WIP level**. This line chart shows any changes or trends over time - the last point on this chart should reflect today. 

Work items are considered active when they are in any Workflow Stage designated as [in progress]. 

![Screenshot 2026-05-20 at 14.56.50.png](media://b7af984b-86b7-496b-b82a-e97df7ce4446)

> ℹ️ These metrics are actually a lot more useful than an average of your whole data set, as it gives you a much clearer picture of your changes in risk over time.

> ℹ️ **Are we there yet? **Before trusting any metric, you **must** define your workflows beginning and end. 
> ℹ️ 
> ℹ️ Just as the [height of a mountain](https://www.55degrees.se/blog/post/what-s-the-tallest-mountain-on-earth) changes depending on whether you measure from sea-level or the earth's core, your metrics are *meaningless* without an internally agreed-upon **Start** (Commitment Point) and **Finish** (Customer Value Delivery). 
> ℹ️ 
> ℹ️ Predictability *only* begins when the boundaries of the system are clearly defined - and you can do this by using the **Dashboard Controls**.

### The Controls

The Dashboard Chart does *not* have controls that are unique to it, so we’ll be covering the basics. 

If you want a more in-depth dive into each Chart Control, head on over to our [dedicated documentation](https://support.55degrees.se/space/SP/4273635348/Global+Chart+Controls).

#### All Charts

The Chart Controls listed here are for **All Charts** - that means that they will affect *all* other charts. 

> ℹ️ Did you know that Jira users can save their carefully crafted data configuration as a **View**? [Here’s how!](https://support.55degrees.se/space/SP/3924886850)

> Macro (refined-tabs)
> 
> > Macro (refined-tab)
> 
> This All Charts Control allows you to choose static dates or rolling period of time, so you can see data from a specific date range. Every Flow Insight will adhere to the date range that you choose. 
> 
> ![Screenshot 2026-05-20 at 15.50.03.png](media://7e2a41be-1133-40b2-aea2-258f5773a5b9)
> 
> - To get **Static Dates**, select directly on the Visible Period’s calendar or manually enter the dates you want in the designated boxes below. These dates will remain the same, hence the *static*.
> - For a **Rolling Period**, pick one of the pre-made options to the right of the Visible Period’s calendar. This period will update to the current day, hence the *rolling*.
> 
> 
> > Macro (refined-tab)
> 
> This All Charts Control gives you the option to narrow down the data you’re analysing by attribute - this includes any Custom Fields brought in during the data set creation process. 
> 
> ![Screenshot 2026-05-21 at 11.04.41.png](media://7df65328-6084-46ea-94fa-7a02ca3d1d6d)
> 
> For the Dashboard, this means that you can have high-level overview’s for different levels of teams and work by choosing different attributes. 
> 
> 
> > Macro (refined-tab)
> 
> We previously mentioned this All Charts Control in the WIP section. Whether you implement a WIP limit organisationally or personally, this will allow you to visualise whether you’re keeping inside the ac:ac:ac:parameters today. 
> 
> ![Screenshot 2026-05-20 at 16.23.35.png](media://40baa431-d4cc-4dfa-a811-93da1a5e8c44)
> 
> 
> > Macro (refined-tab)
> 
> This All Charts Control designates which Workflow Stages are considered [not started],  [in progress] and [finished]. Work items within each Workflow Stage will adhere to that sorting and count toward the calculations of Cycle Time, Throughput, WIP and Age. 
> 
> ![Screenshot 2026-05-21 at 10.56.54.png](media://f9f6e417-b533-4a55-aa10-af8afdeeb1df)
> 
> The Workflow Stages are colour-coded so you can easily tell where the workflow starts and ends. Unchecking from the top down creates a later start, unchecking from the bottom up makes an earlier finish. Unchecking in the middle will merge your Workflow Stage with the one above - it will *not* remove or delete time spent in that Workflow Stage. 
> 
> ![Screenshot 2026-05-21 at 10.56.04.png](media://eb4b70e2-e064-491d-adbc-8b02f771cacb)
> 
> On the Dashboard, this allows users to look at custom, micro workflows; such as wanting to see the metrics from *Analysis Active* to *Dev Done*.

#### This Chart

The Chart Controls listed here are for **This Chart** - that means that they will only affect the current chart. 

> Macro (refined-tabs)
> 
> > Macro (refined-tab)
> 
> The Item Filter for This Chart functions in the same way as the All Charts version, the main difference is that it *only* affects the current chart you’re on and attributes you’ve filtered by in the All Charts version will be the only choices available. 
> 
> ![Screenshot 2026-05-21 at 11.13.22.png](media://11b78e72-1fe1-4f40-99a2-66a45273ffcf)
> 
> > Macro (refined-tab)
> 
> The Workflow Stages for This Chart function in the same way as the All Charts version, the main difference is that it *only* affects the current chart you’re on and Workflow Stages you’ve chosen in the All Charts version will be the only choices available. 
> 
> ![Screenshot 2026-05-21 at 11.16.41.png](media://59f4677d-3d94-406e-9146-1f12218cf7a6)